Rochdale next stop for metrolink
Date published: 22 February 2013
OLDHAM Metrolink users will soon be able to catch the tram to Rochdale: the line is set to open next Thursday.
The 4.6-mile extension to the Shaw and Crompton line will run to Rochdale railway station, serving the former stations at Newhey and Milnrow and two new destinations at Kingsway and Newbold.
The first public tram from Rochdale will leave at 5.59am, while the first tram to Rochdale will leave Manchester Victoria at 6.08am. Services will run every 12 minutes.
Tickets from Rochdale to Shaw & Crompton, and all stops between, will cost £1.80 for a peak “anytime” single and £2.60 for a peak “anytime” return.
The Rochdale extension will bring the total size of the network to 43 miles.
By the time new lines to East Didsbury (summer 2013), Ashton (winter 2013/14), Oldham and Rochdale town centres (2014), and Manchester Airport via Wythenshawe (2016) are complete, the network will cover 59 miles — more than three times the original 18.5-mile network of 1992.
Most Viewed News Stories
- 1Oldham responds to ‘administrative error’ that saw councillors overpaid for years
- 2Oldhamer Jim who faced losing a leg due to smoking celebrates 1,000 days being smoke-free
- 3Plan for apartments on derelict land refused
- 4‘We are being tormented by squirrels who keep gnawing their way into our attic’
- 5Firefighters called to three-car crash in Diggle